RSK80006 Risk Management Systems Case Study Sample

RSK80006 Risk Management Systems

Task

This case-study based Group Project has two components (10 points each). If possible workshop the process with your team, but as a minimum consults with them, on at least the vulnerability assessment. Both parts could be researched as covered in the lectures. You can find further details from the R2A text1.

1. Vulnerability Assessment

Apply the Vulnerability Assessment technique to a project of interest to you.
Ideally one associated with your work but failing that choose a project with publically available information, for example, those described by the federal government for major infrastructure projects2 or the PTV3.

In doing so:

• clearly document the project’s critical success outcomes and the reason/s why these were   selected
• document the threats and the method of selection of these threats
• determine the critical vulnerabilities

2. Precautionary Analysis

Using the Vulnerability Assessment undertaken in the above stage, develop precautionary recommendations for the identified vulnerabilities. You may use a technique described in the lecture presentation or one sourced from elsewhere. The purpose is to demonstrate that all reasonably practical precautions are in place based on the balance of the significance of the risk vs the effort required to reduce it. 

The final outcome could be a project risk profile, and ranked investment action list.

Project Overview

The metro tunnel project is a 9Km twin tunnel rail project that will connect the western suburbs of Melbourne to the south-eastern suburbs. The project will deliver a new end to end rail line from Sunbury in the west to Pakenham in the south-east, with high-capacity trains and 5 new underground stations. The metro tunnel project was needed as the Melbourne city loop was running at full capacity and was highly congested. Passengers that were using the city loop had to spend a lot of time for travelling from south to west and had to inter-change trains at Richmond or Flinders Street. Hence the metro tunnel project was born which would reduce the travel time of passengers using the city loop and regional lines and would untangle the city loop so that more trains could travel. The new metro tunnel would have the capacity for carrying around 500,000 passengers weekly across Melbourne’s train network during its peak periods and would also create a better access to Melbourne airport. The project scope includes a new high-capacity signalling system to maximise the efficiency of the new high-capacity metro trains and trams Anzac station.

The Tunnel and Stations Public Private Partnership (PPP) is the largest package of works for the Metro Tunnel with five new underground stations (i.e., Arden station, Parkville station, Town hall station, Anzac station and State library station). Rail projects Victoria is responsible for planning and developing the project reference design, site investigations, stakeholder engagement, planning approvals and progressing each project through procurement before handing over to the rail operator. Transport for Victoria is Rail project Victoria’s primary client, other key stakeholders are Public Transport Victoria, Metro Trains Melbourne, V/Line, Lendlease Engineering and Capella capital.

CPB Contractors are the main principal contractors and John Holland is the managing contractor of the project. The Metro Tunnel project is estimated to cost around $ 7 billion and is expected to complete by 2025.

Solution

Melbourne metro project has to face the threat of data analytics and wrong forecast of passenger data. The application of the data analytics has resulted in identifying the critical data as the expected footfalls and traffic in metro (Xia et al., 2018). It can help in developing strategies for management of the traffic and imply critical application of management of transportation services. According to MBA Assignment expert However, the Melbourne metro project has been facing issues in the management of the traffic and aligning smart activities due to changes in forecast of passengers. The change can result in the critical problems for the execution of the strategy develop in the passenger and transport service management. 

The change in the transportation legislation can act as a threat for the smooth operations at Melbourne Metro. The effective application and management of the activities have also embarked with the alignment and execution of the work (Chen et al., 2022). The integration and the successive development of plan of action can result in the cohesive program development. The change in the respective legislation can deploy the creative role setting and management of the operating needs. The legislation in transportation helps in the change of policy for transport services. It can result in the respective issues for providing the passengers with the existing policies and services. 

The problems from the community while the execution of the Melbourne metro project is another major threat.  The respective opposition of community with the services and delivery option can force setting back the smart execution of the project (Gharehbaghi et al., 2019). The imperative analysis of the metro rail project is facing problems, during the service delivery of the operations. The critical integration and development has resulted in keeping the prominent role for setting and evaluating the competent management of the facilities. The role in setting and developing prominent alignment of the agitation and opposition from the local community. 

Construction projects are likable to face the possible accidents and injury among the workers during the Melbourne Metro Project. The specific construction projects are marked with the imperative actions enabling the possible issues of injury (Guerrieri et al., 2020). During the construction, there are possibility of occurrence of accidents that can be fatal. The construction project works are also marked with the possibility of machine and equipment failure, which can also result in the threat for the project. The management of the imperative construction projects are evaluated with the consideration of issues of fatal errors during the construction of metro. 

The construction project of Melbourne Metro is under the threat of delays in approvals for the operations and works. The project has been facing several scrutiny and analysis before the project can get a go-ahead (Eliasson, Forsman & Nyman, 2022). The progress of the project is also marked with the confined management of the work. The delays in approval can be marked due to the consideration and evaluation of the key work development. The imperative management and support has helped in keeping the respective execution of the program of work. The delays can be due to some internal issues like quality, information, and progress monitor requirements, and also external issues such as human mistake, and wrong or absence of documentation. 

The environment consideration is a crucial factor that can impact the critical application and development of the options enabling the consent for developing and aligning options. It is important for ensuring minimum waste generation for the Melbourne Metro Project. The consideration of the work is limited for creating the aspect of managed projection (Eliasson, Forsman & Nyman, 2022). The environmental consideration has listed with the prominent evaluation and development of key facilities. The prominent estimation of the environment pollution is managed for keeping the operations and developed continued progress. 
Vulnerability Assessment Table

Precautionary Analysis

The construction project of Melbourne Metro has to face several issues and threats like Changes in passenger forecast, Changes to legislation, Community opposition, Construction fatality or injury, Delays in approvals, Issues with being on budget, and Pollution during construction. These threats can result in harming the flow of the project works and limit the construction works (Guerrieri et al., 2020). The application of the precautionary principles for threat mitigation can help the project for overcoming the impact of the threats (Gharehbaghi et al., 2019). The principles of precautionary analysis for the project of Melbourne Metro includes presumption of prevention needs, identification of the preventive measure, application of the preventive needs, analysis of the impact, and corrective measures. These have been explained below for the project of Melbourne Metro, 

a) Presumption of prevention needs can result in the identification of the needs for implementing the precautionary analysis for the project. It can evaluate past reports and the needs of the project, so that the team can identify whether precautionary analysis should be applied or not. 

b) Identification of the preventive measure for the project is the next step for the precautionary analysis of Melbourne Metro project. This step identifies the strategies that should be followed for the implication of the precautionary analysis.

c) Application of the preventive needs is the main process, where the identified strategies are implied for the development of the precautionary analysis. The metro project can get the support of implementing and aligning the creative measures supporting the activities in the project.

d) Analysis of the impact helps in the analysis of the precautionary analysis on threats during the execution of the metro project works. Whether the precautionary analysis strategies are successful or not is evaluated in this stage.

e) Corrective measures are set for marking and managing the competent control of the facilities as a major role in setting competent control development. 

Reference List

Eliasson, K., Forsman, M., & Nyman, T. (2022). Exploring ergonomists’ experiences after participation in a theoretical and practical research project on observational risk assessment tools. International Journal of Occupational Safety and Ergonomics, 28(2), 1136-1144. https://www.tandfonline.com/doi/pdf/10.1080/10803548.2020.1870836 

Gharehbaghi, K., McManus, K., Hurst, N., Robson, K., & Myers, M. (2019). Complexities in mega rail transportation projects:“Sydney metro” and “Melbourne metro rail” insight. Journal of Engineering, Design and Technology. https://www.emerald.com/insight/content/doi/10.1108/JEDT-08-2019-0207/full/html 

Guerrieri, M., Sanabria, C., Lee, W. M., Pazmino, E., & Patel, R. (2020). Design of the metro tunnel project tunnel linings for fire testing. Structural Concrete, 21(6), 2452-2480. https://onlinelibrary.wiley.com/doi/abs/10.1002/suco.202000140 

Xia, Y., Xiong, Z., Lu, H., Wen, Z., & Ma, C. (2018). Fuzzy risk assessment of a deeply buried tunnel under incomplete information. Royal Society Open Science, 5(10), 180305. https://royalsocietypublishing.org/doi/pdf/10.1098/rsos.180305

Still in Dilemma? See what our users have to say about our services.

student rating
Management

Essay: 10 Pages, Deadline: 2 days

They delivered my assignment early. They also respond promptly. This is excellent. Tutors answer my questions professionally and courteously. Good job. Thanks!

flag User ID: 9***95 United States

student rating
Accounting

Report: 10 Pages, Deadline: 4 days

After sleeping for only a few hours a day for the entire week, I was very weary and lacked the motivation to write anything or think about any suggestions for the writer to include in the paper. I am glad I chose your service and was pleasantly pleased by the quality. The paper is complete and ready for submission to the professor. Thanks!

flag User ID: 9***85 United States

student rating
Finance

Assignment: 8 Pages, Deadline: 3 days

I resorted to the MBA assignment Expert in the hopes that they would provide different outcomes after receiving unsatisfactory results from other assignment writing organizations, and they genuinely are fantastic! I received exactly what I was looking for from this writing service. I'm grateful.

flag User ID: 9***55

student rating
HR Rrecruiter

Assignment: 13 Pages, Deadline: 3 days

Incredible response! I could not believe I had received the completed assignment so far ahead of the deadline. Their expert team of writers effortlessly provided me with high-quality content. I only received an A because of their assistance. Thank you very much!

flag User ID: 6***15 United States

student rating
Management

Essay: 8 Pages, Deadline: 3 days

This expert work was very nice and clean.expert did the included more words which was very kind of them.Thank you for the service.

flag User ID: 9***95 United States

student rating
Thesis

Report: 15 Pages, Deadline: 5 days

Cheers on the excellent work, which involved asking questions to clarify anything they were unclear about and ensuring that any necessary adjustments were made promptly.

flag User ID: 9***95 United States

student rating
Economics

Essay: 9 Pages, Deadline: 5 days

To be really honest, I can't bear writing essays or coursework. I'm fortunate to work with a writer who has always produced flawless work. What a wonderful and accessible service. Satisfied!

flag User ID: 9***95

student rating
Taxation

Essay: 12 Pages, Deadline: 4 days

My essay submission to the university has never been so simple. As soon as I discovered this assignment helpline, however, everything improved. They offer assistance with all forms of academic assignments. The finest aspect is that there is also an option for escalation. We will get a solution on time.

flag User ID: 9***95 United States

student rating
Management

Essay: 15 Pages, Deadline: 3 days

This is my first experience with expert MBA assignment expert. They provide me with excellent service and complete my project within 48 hours before the deadline; I will attempt them again in the future.

flag User ID: 9***95 United States

footer

Get Free Assistant Help

Follow up the given below and get a call back from our experts.